Taylor Hills Subdivision

CES provided professional services for the Taylor Hills subdivision a 348 lot subdivision on 42 acres in Lexington County SC.  CES services included the preliminary plat, design of 6,570 l.f. public roadways, 8” water and 8” sanitary sewer infrastructure, SCDOT roadway connection improvements, grading and stormwater design, and SWPP package. Final pad certification for commencement of home building is scheduled for mid 2023.

PROJECT HIGHLIGHTS

    • 348 lot subdivision
    • Public roadway design
    • Water and sanitary sewer infrastructure

Interested in working with us?

Name(Required)

Recent Projects

Crescent Hills Subdivision

CES provided professional services for the Crescent Hills subdivision a 600 lot subdivision on 313 acres in Lexington County SC.   CES services included the preliminary plat, design of 21,164 lf. public roadways, 8” water and septic throughout, SCDOT roadway connection improvements, grading and stormwater design, SWPPP package, wetlands survey and trophy tree survey. Final pad…

Freddy’s Restaurant and Starbucks Coffee Building

CES provided professional services for the Freddy’s Restaurant and Starbucks Coffee building on Commerce Boulevard in Barstow, CA.   This development consisted of a Freddy’s Restaurant building with 1 drive thru lane and emergency escape lane, parking, signage and a Starbucks Coffee building with drive thru and parking.   CES provided all onsite Civil Plan preparation, Site…

Hydrogen Fuel Station and Service Bays

CES provided professional services for the Toyota Hydrogen Fuel Station development at the Servco Toyota dealership in Honolulu.  This development consisted of an electrolysis station, hydrogen fuel storage, and canopied dispensary, and several service bays for hydrogen fueled Toyota vehicles.  CES provided all onsite Civil Plan preparation, Site Plan, Grading and Stormwater design, water utility…