
CES provided professional services for the Recovery and Rehabilitation Center in Morristown Arizona 35 miles northwest of Phoenix. This development consisted of a 70 bed drug rehabilitation center, with parking, water storage and sewer septic system. CES provided all onsite Civil Plans, site plan layout, grading and stormwater design, SWPP package, water and sewer utility design plans, fire suppression storage tank with pump system, domestic water tank with pump system, fireline, septic tank and leach field and offsite roadway plans per Maricopa County standards.
PROJECT HIGHLIGHTS
Interested in working with us?
Recent Projects
Crescent Hills Subdivision
CES provided professional services for the Crescent Hills subdivision a 600 lot subdivision on 313 acres in Lexington County SC. CES services included the preliminary plat, design of 21,164 lf. public roadways, 8” water and septic throughout, SCDOT roadway connection improvements, grading and stormwater design, SWPPP package, wetlands survey and trophy tree survey. Final pad…
Hydrogen Fuel Station and Service Bays
CES provided professional services for the Toyota Hydrogen Fuel Station development at the Servco Toyota dealership in Honolulu. This development consisted of an electrolysis station, hydrogen fuel storage, and canopied dispensary, and several service bays for hydrogen fueled Toyota vehicles. CES provided all onsite Civil Plan preparation, Site Plan, Grading and Stormwater design, water utility…